2023-12-11 ET-W2AT Meeting

 Date

Dec 11, 2023 13:00-15:00 UTC

 Participants

ET-W2AT

No

Name

Role

Present (yes/no)

No

Name

Role

Present (yes/no)

1

Mr Jeremy TANDY

Chair

 

2

Mr Rémy GIRAUD

Member

Yes

3

Mr Pablo Jose LOYBER

Member

 

4

Ms FATIMA SABAI

Member

 

5

Mr Peng  WANG

Member

 

6

Mr Tom KRALIDIS

Member

 

7

Mr Kenji TSUNODA

Member

Yes

8

Dr Baudouin RAOULT

Member

Yes

9

Mr Thorsten BÃœSSELBERG

Member

 

10

Ms Dana OSTRENGA

Member

 

11

Mr Simon ELLIOTT

Member

 

Experts

  • Kai Wirt

WMO Secretariat

  • Enrico Fucile

  • Hassan Haddouch

  • @Xiaoxia Chen

  • David Inglis Berry

 Discussion topics

Item

Item

Presenter

Notes

Item

Item

Presenter

Notes

1

Review the WIS 2.0 Guide

 

Timeline for WIS2 Guide and Transition Guide preparation

  • By end of this week: Editorial volunteers to submit . Then all contributions can be merged. Consistency (acronym, terms) is required in the documents.

    • Action: to merge the available pull request on GitHub

  • Between mid-December and end January need to be delivered to translators.

  • 8 January: last check of the contributors (Plan B needed)

Check the status of draft Guide to WIS

  • Kai (PR) received. Kai: GTS to WIS2 accepted the PR, can be merged.

  • 90% done from Rémy’s side (2.3.1 Procedure for registration of a Global Service)

  • Secretariat: 1.1 Introduction of WIS2

  • ICAO: in the progress of ICAO colleagues

Action:

2.2.1 Practices and procedures: wis2node registry needs to be included

NC/DCPC shall publish data as a WIS2 node

Stress test

(Enrico) Fit for Global Services, putting the stamps, which needs to be in Res. 2025 is entering operational phase. Official list needs to be submitted to INFCOM before entering operational phase. Assessment not included in the Res. Technical part + by end of 2024.

(Rémy) Verify, technical assessment (confirmation form PR), formal assessment needed at a later stage. No need to check the current Global Services performing well or not NOW.

For new Global Services, Expert Team on Implementation and Transition (a new ET) to manage its approval.

(Hassan) Recommendation of list of Global Services

Action 2: (Hassan) to send a reminder for the volunteers to finish the WIS2 Guide and Transition Guide review/editorial (submission: by end of this Friday)

Action 3: (Rémy) to share the image in MERMAID with the Secretariat.

WIS2 registry

Coordination should be carried out by Secretariat.

Action 4: (Rémy) needs to add the access control (WIS2node) in the diagram.

2

 

 

 

3

 

 

 

4

 

 

 

 Action items

Next meeting

Â