Peter: wis2box with new format, message from the request, gaps in implementation, and see how the gaps be filled and suggestions to be proposed.
Baudouin: catelogorization is missing
Tom: put GeoJSON in my case
2. Message distribution
All
Remy presented the update on message distribution and data access and download.
Peter: all protocols implementation per connection is semantic identical to “msg_id”
3. data access and download
All
Boudouin: hash not checked, verify correct or not,
Remy: data_id (msg_id to identify the message), do we use hash to check the integrity (checksum)?
Peter: same id-->same hash
Boudouin: so currently, we don’t use hash to do the checksum
Tom: data_id, header, apply to the response, to serve as cache validation, ear Tag
Remy: how to identify the duplicated messages
Boudouin: we have problems of deduplication and loops which are different problems. Using unique ID
Peter: message id is generated by Global cache
Remy: Do we want some tailored to WIS2? Our goal is to design a solution that people can implement in different ways.
Tom: any objection to testing the proposal? To add an identifier element to the properties and then to test it
Remy: we need the guide on WIS/WIS2 to be approved by Cg2023. Our goal to deduplicate the data download.
Thorsten: I agree to test the new proposal of data format.
Peter: how the user can tell whether the data can be downloaded or not
Remy: no access control to cache, data can be controlled by the metadata
Topic be included in ID?
Remy: both message ID and data ID are UUID
Remy: preoperational phase will start later this year. The main functions of GB/GC are clear.
Hassan: For the constraint of time, the details will be described into Guide. The next year will be the experimental year. So currently, we need to agree on the concepts and then try to test it.
David: I am a big fan of tidy data and keeping everything explicit with one piece of information per field rather than mixing up multiple pieces of information and then having to parse it to extract the data.
4 dataflow of a center
All
Register a new NC or NCPC
Register a new dataset
Remy: The next step is to contact GTS experts to see how the transition looks like. Transition proposal to be ready in Mid May. No general rules for GTS to switch off to WIS2.
Thorsten: mid May is good
Kenji: Workshop in January (8 countries joined), most of them concerned their GTS. If GTS messages stop, the forecasting and warning issues will be a concern. It is not only for GTS, but also for operational issues. (internal downstream central system)
Remy: Transition is important, which means we need to work on the design, to explain WIS2 and time frame and the centers willing to migrate from GTS to WIS2 need to modify their systems to comply with the new design. For the downstream or upstream system is out of the scope of the ET-W2AT.
Decision: May 23rd: for the first review of potential proposal for transition plan (to invite GTS experts to join the meeting)
Remy: to help NC transite is different from GTS/WIS2 transition, although it is also important work.