Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Current »

Documents related to WIS 2.0 to be submitted to INFCOM-2

A demonstrator project workshop will take place in September and the report from the workshop will be used as the basis for the INFCOM-2 document.

  • WIS 2.0 Architecture and transition. Not ready to be published in Manual on WIS. Draft to be reviewed in 2022 and finally submitted to CG-19 (2023)

    • Real-time data exchange (GTS replacement)

      • Overall architecture. How many brokers? where? what for?

      • Organise transition from GTS to WIS2. Eg. RTHs could implement a GTS to WIS2 “interface” and when receiving data on their FTP server, publish the data using pub/sub and allow the direct download.

    • Catalogue and Search

      • Analysis of current WIS catalogue content

      • New experimental catalogue requirements and technical specs.

      • Proposal for catalogue migration

    • GISCs and other WIS Centers roles and services sharing

      • Considering the current functions in GISCs/DCPC/NC do a gap analysis

    • KPIs for WIS to WIS2 transition

    • Requirements for transition monitoring tools

  • MQP Draft Technical Specifications. Not ready to be published in Manual on WIS, only experimental (to be ready for Cg-19 (2023)).

    • Protocols

    • Topic structure

    • Message structure

    • Filename

  • CF-NetCDF in Manual on Codes. Ready to be published in the manual (EC-74).

    • General regulations

    • Marine trajectory

    • Radar

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.