Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

\uD83D\uDDD3 Date

13:00-15:00 UTC

\uD83D\uDC65 Participants

ET-W2AT

No

Name

Role

Present (yes/no)

1

Mr Jeremy TANDY

Chair

No

2

Mr Rémy GIRAUD

Member

Yes

3

Mr Pablo Jose LOYBER

Member

No

4

Ms FATIMA SABAI

Member

No

5

Mr Peng  WANG

Member

Yes

6

Mr Tom KRALIDIS

Member

No

7

Mr TSUNODA, Kenji

Member

Yes

8

Dr Baudouin Raoult

Member

Yes

9

Mr Thorsten BÜSSELBERG

Member

No

10

Ms Dana Ostrenga

Member

No

Experts

  • Weiqing QU (BoM)

  • Wirt Kai-Thorsten (DWD)

WMO Secretariat

\uD83D\uDDE3 Discussion topics

Item

Item

Presenter

Notes

0

Review of actions from the last meeting

Hassan

  • Action 1: Secretariat to check the Cg-Ext(2021)/Res.1 to verify the coherence of “no issue in making "more" core data available”

3.4 The recommendation to Members is therefore to adopt the following national practice regarding the exchange of Earth system data

(e) Members are encouraged to broaden the provision of their data with a minimum of conditions beyond the minimum set of data listed in Annex 1 to the present resolution.

  • Action 2: GTS to WIS2 Gateway: Secretariat to confirm with DWD and JMA if they are providing these gateways

    • DWD is doing it using Topic Hierarchy: cache/a/wis2/xxg/gts_to_wis2_dwd/TTAAii

  • Action 3: WIS2 to GTS Gateway: Secretariat to check if TTAAii is enough or we need CCCC

    • CCCC is needed after consultation with GTS experts in BoM, JMA, DWD and Morocco Météo.

1

"Urgent" 

(1) Rémy: agreed the current decision

Timo: to provide supporting documents of MQTT best practice.

In general, MQTT best practice is to publish the message with two (multiple) topics.

(2)WIS2 Guide will be a collection of all information.

(3)clarify QoS parameters as well as retention for brokers

Decision: to park this now

Action: For Remy to check with Verne MQ to discuss with MQTT experts for their advice to selecting the parameters

Action (TBC): For Peng to discuss with EMQS experts for possible suggestion, if possible

(4) WP8.2 WIS2 to GTS gateway,

https://github.com/wmo-im/wis2-notification-message/issues/24

Action: Hassan to provide the document with decisions and relevant information( update ASCII code, MQTT parameters (needed) as an individual document, all independent documents that can be integrated into WIS2 guidance)

WHO will run for the gateway?

  • Considering no volunteer for the Gateway, proposed solution is for one or two RTHs per region to do the gateway from WIS2 to GTS.

  • Action: Hassan will collect all RTH contact points. Hassan proposed to have meetings with potential RTH providers and prepares one page for this.

(5) KPIs for the transition from GTS to WIS2

Decision: Kai agrees to run the GTS to WIS2 Gateway by DWD during transition

Action: Kenji to check the possibility of providing the gateway by JMA

(Kai) DWD metrics number of observations received in DWD and WIS2 network. Per station and per country.

(Enrico) High-level KPIs, not too technical, for communication to EC/Cg is needed to get started. For example, the number of Members disseminating data in GTS but not WIS2; the number of Members migrating to WIS2.

Action: Enrico to provide a drafted version of high-level KPIs to be submitted to INFCOM-3.

2

"We need to figure this out for the pilot project" 

Not discussed

3

"We need to figure this out for INFCOM3" 

Not discussed

✅ Action items

  • Timo: to provide supporting documents of MQTT best practice.
  • Remy to check with Verne MQ to discuss with MQTT experts for their advice to selecting the parameters
  • Peng to discuss with EMQS experts for possible suggestion, if possible
  • Hassan to provide the document with decisions and relevant information( update ASCII code, MQTT parameters (needed) as an individual document, all independent documents that can be integrated into WIS2 guidance)
  • Hassan to collect all RTH contact points; to prepare one page for this discussion with RTHs about their willingness to play WIS2 to GTS gateway for their AoRs.
  • Kenji to check the possibility of providing the GTS to WIS2 gateway by JMA
  • Enrico to provide a drafted version of high-level KPIs to be submitted to INFCOM-3

⤴ Decisions

  • DWD agrees to run the GTS to WIS2 Gateway during transition

  • No labels