Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Rémy GIRAUD (SC-IMT Chair)

  • Lei XUE (SC-IMT Co-Vice-Chair)

  • Jeremy TANDY (SC-IMT Co-Vice-Chair)

  • Masato FUJIMOTO (JMA)Kari SHEETS (NOAA)

  • Chemseddine El Garai (DMN)

  • Xinqiang HAN (CMA)

  • Wenjing GU (CMA)

  • Schremmer Antje (DWD)

  • Saad Almajnooni (NCM)

  • Mohammed ALGHAMDI (NCM)

  • Omar Daftardar (NCM)

  • Tom KRALIDIS Hyumin EOM (ECCCKMA)

  • Max Marno Yoritsugi YUGE (SYNOPTICJMA)

  • Hyumin EOM Baudouin Raoult (KMAECMWF)

WMO Secretariat

  • Enrico Fucile

  • Hassan Haddouch

  • Xiaoxia ChenDavid Berry

  • Anna Milan

  • Timo Proescholdt

Apologies

...

  • Thorsten Büßelberg (DWD)

  • José Mauro DE REZENDE (INMET)

  • Steve Olson (NOAA)

  • Kari SHEETS (NOAA)

  • Max Marno (SYNOPTIC)

  • Tom KRALIDIS (ECCC)

Agenda and Notes (DRAFT)

  1. Progress on the preparation of the performance tests of GS (all GSs)

  2. Progress setting up the wis2dev test environment

  3. Tests Plan (Hassan)

  4. AoB

Item

Presenter

Notes

0

Actions from last meeting

  • Antje to open a GitHub issue how to keep metrics clean over a longer period

  • Jeremy to connect Lei to Met Office WIS2 to GTS gateway team for further discussion

  • Lei and those who are interested in a mock test to contact Hassan to schedule a mock test in the second half September

  • Lei to create a GitHub issue for WIS2 to GTS gateway questions

  • Hassan to coordinate the GC/GDC Dashboard provided by GM (Morocco)

  • Max to complete the documentation and scripts for GC tests

  • Tom to complete the documentation and scripts for GDC tests

  • Lei and Chems to complete the documentation and scripts for GM tests

1.Progress on the preparation of the performance tests of GS (all GSs)

all

2.Progress setting up the wis2dev test environment

3.Tests Plan

Hassan

4.AoB

5.

...

1.Progress on the preparation of the performance tests of GS (all GSs)

all

(Lei) test cases are updated on GitHubk waiting review from Chems. Dashboard for GC& GDC provided by GM(Morocco) ready or not? IMS interface details is not yet received.

(Rémy) no plan for GM test using scripts. We need to check the configuration, like alerting, Jira communication.

(Hassan) dedicated meeting of IMS was needed for discussion for approval of the workflow of incidents.

(Jeremy) automated scripts for GM, open metrics → scraped by GM → alert → tickets raised in Jira, such workflow is needed for test automatically.

(Rémy) workflow was well described in WIS2 Guide. No need to discuss the workflow. At December physical meeting, it is a good time to inform GISCs and GS operators about the workflow.

Action: exchange of discussion and information on IMS to be created in GitHub to track. @Hassan to provide a summary of current status and progress.

Actions> (Xiaoxia) to send out an instructions to each GS instance, including their confirmation of the documentation and also asking for comments if there are, and the detailed timeline.

(Omar) GC (Saudi Arabia) is expected to be ready this week.

2.Progress setting up the wis2dev test environment

(Rémy) physical environment is almost ready for mock test.

(Antje) presented the overview of the VMs running on AWS test node X-wis2dev.io. The functional tests are available from the Documentation. Scripts are missing currently.

(Jeremy) Time for mock test. Anyone interest for mock test, please contact Hassan.

Date of orchestrations scripts to be expected to be ready: in another two weeks at the next meeting.

Test will be using gb.wis2dev.io + gc.wis2dev.io + gm.wis2dev.io for test.

Decision: all scripts aim to be ready in next 2 weeks. At the next meeting, to present how the scripts are working and the examples.

3.Tests Plan

Hassan

Hassan presents the performance tests timeline.

Pre-tests> Germany, China to confirm their dates.

Performance test> 27 September - 23 October

(Rémy) Suggest to move 11-20 September to 17 September, making sure the scripts are ready for mock test. And the week of 23 September to be flexible for additional tests before performance tests. (China: 18 September; Antje: 17 September)

Action: Hassan to update the schedules based on the confirmation from Antje and Lei.

Action: GS operators to provide the details on their test dates

4.AoB

Test coordination: done by Secretariat

Test team: Rémy on the first day of GB test, Max: GC, Tom: GDC + GS instance operator + Secretariat

Actions:

@Hassan

  •  Hassan: to provide a summary of current status and progress on GitHub as an open platform for exchanging discussion and information on IMS
  •  Xiaoxia: to send out an instructions note to each GS instance, including their confirmation of the documentation and also asking for comments if there are, and the detailed timeline
  •  Hassan: to update the schedules for pre-test based on the confirmation from Antje and Lei.